stick label machine
Product Detail:
Parameters
Model | SYB-1 |
Bottle size | 50ml—5000ml |
Bottle diameter | Ø21—Ø48mm |
Label specification | 76 * Ø 300 (inner diameter, outer diameter) |
Output | 50-100 per min (depending on label length) |
Power Supply | 50HZ 220V-380V(can be adjusted as required) |
Total power | 0.7KW |
Size | 2000*1000*1300mm |
working principle
1. Stainless steel structure of the whole machine: stainless steel SUS304 is adopted, with simple structure, beautiful appearance, easy cleaning and waterproof and rust free.
2. Special label location device: ensure accurate positioning of label during the labeling process.
3. Adopt modular design and chopsticks control to achieve accurate and high-speed standard setting.
4. High quality touch screen is used to operate the section to realize finger operation, which is convenient and fast.
5. The whole machine is highly automatic, easy to use, only needs one person operation and easy to maintain.
6. Adopt Omron servo system, use Panasonic servo system, and ensure international quality
Internal structure
Electrical brand
Use Parts
Packaging and delivery
Q1: Are you a factory or a trading company?
A1: We are a factory integrating industry and trade, and we have 23 years of production experience. Our factory covers an area of more than 2,000 square meters, which is used to produce all kinds of bottled water, bottled water and other complete production lines.
Q2: Do you provide customized service?
A2: We will customize the most suitable equipment according to your requirements, such as the output requirements, filling type, bottle types, materials, power, etc. At the same time, we will provide you with professional advice based on experience
Q3:What are your prices?
A3:Our prices are subject to change depending on supply and other market factors. We will send you an updated price list after your company contact us for further information.
Q4: When can I get my machine after payment?
A4: We will deliver the machines on time as the date we agreed both side.
Q5: How to install after my machine arrives? How long does it take to install?
A5: After all the preparations are in place, we will send our engineers to your factory to be responsible for the installation and commissioning of the equipment, and teach your technicians how to run the equipment. The installation time depends on the specific number of equipment, generally takes 10-25 days.
Q6: What’s your guarantee or the warranty of the quality if we buy your machines?
A6: We provide you with high-quality machines with a warranty period of 1 year. We will provide you with spare parts for free within 2 years, and provide lifetime technical support.