SF 3000CPH automatic can filling machine
Product Detail:
Applicable bottle type
Parameters
Model |
GDX 12-4 |
GDX 18-6 |
GDX 24-6 |
Capacity(500ml) |
3000cph |
5000cph |
10000cph |
Filling heads |
12 |
18 |
24 |
Capping heads |
4 |
6 |
6 |
Suitable can type |
Aluminum can/Tin can/Plastic can |
||
Can diameter |
Φ50-99mm |
||
Can height |
70-130mm |
||
Total power |
2.4 |
4.4 |
5.4 |
Overall dimensions |
2.5*1.9*2.2m |
2.8*1.9*2.2m |
3.3*2.2*2.3m |
Weight |
2300kg |
3300kg |
4000kg |
It is applicable for equal pressure filler and capper of carbonated drinks in beer and coca cola ,pepsi drink and other carbonated drink production industry. It is a pop canned beer in the digestion and absorption of advanced foreign and domestic sealing machine on the basis of independent development of the can filling, sealing unit. Filling and sealing is the overall designed, power system by filling sealing system to ensure that both the absolute synchronization and coordination.
It adopts the advanced machine, electrical equipment, and pneumatic control technology. It has the characteristics of smooth filling, high speed, liquid level control, capping reliably, frequency conversion timing, less material loss.
Internal structure
Electrical brand
Use Parts
Packaging and delivery
Q1: Are you a factory or a trading company?
A1: We are a factory integrating industry and trade, and we have 23 years of production experience. Our factory covers an area of more than 2,000 square meters, which is used to produce all kinds of bottled water, bottled water and other complete production lines.
Q2: Do you provide customized service?
A2: We will customize the most suitable equipment according to your requirements, such as the output requirements, filling type, bottle types, materials, power, etc. At the same time, we will provide you with professional advice based on experience
Q3:What are your prices?
A3:Our prices are subject to change depending on supply and other market factors. We will send you an updated price list after your company contact us for further information.
Q4: When can I get my machine after payment?
A4: We will deliver the machines on time as the date we agreed both side.
Q5: How to install after my machine arrives? How long does it take to install?
A5: After all the preparations are in place, we will send our engineers to your factory to be responsible for the installation and commissioning of the equipment, and teach your technicians how to run the equipment. The installation time depends on the specific number of equipment, generally takes 10-25 days.
Q6: What’s your guarantee or the warranty of the quality if we buy your machines?
A6: We provide you with high-quality machines with a warranty period of 1 year. We will provide you with spare parts for free within 2 years, and provide lifetime technical support.