Quartz sand/activated carbon precision filter
Parameters
working principle
We adopt different equipment to produce pure water, mineral water etc. The main equipment are silica sand filter, active carbon filter, sodium ion exchanger, hollow fiber, RO( reverse osmosis), UV sterilizer, precision filter, ozone generator, water tank etc. The treatment capacity is 0.5-50 ton/hour. It can effectively get rid of muddy organic matter, iron, manganese and oxide, filter suspended substance, colloid, remained oxygen of microorganism and some of heavy metal ion in the water, reduce the hardness of the water to make all specifications of the water quality fully meet the state fresh water standard of fresh drink water.
It can effectively get rid of muddy organic matter, iron, manganese and oxide, filter suspended substance, colloid, remained oxygen of microorganism and some of heavy metal ion in the water, reduce the hardness of the water to make all specifications of the water quality fully meet the state fresh water standard of fresh drink water.
Internal structure
Electrical brand
Use Parts
Packaging and delivery
Q1: Are you a factory or a trading company?
A1: We are a factory integrating industry and trade, and we have 23 years of production experience. Our factory covers an area of more than 2,000 square meters, which is used to produce all kinds of bottled water, bottled water and other complete production lines.
Q2: Do you provide customized service?
A2: We will customize the most suitable equipment according to your requirements, such as the output requirements, filling type, bottle types, materials, power, etc. At the same time, we will provide you with professional advice based on experience
Q3:What are your prices?
A3:Our prices are subject to change depending on supply and other market factors. We will send you an updated price list after your company contact us for further information.
Q4: When can I get my machine after payment?
A4: We will deliver the machines on time as the date we agreed both side.
Q5: How to install after my machine arrives? How long does it take to install?
A5: After all the preparations are in place, we will send our engineers to your factory to be responsible for the installation and commissioning of the equipment, and teach your technicians how to run the equipment. The installation time depends on the specific number of equipment, generally takes 10-25 days.
Q6: What’s your guarantee or the warranty of the quality if we buy your machines?
A6: We provide you with high-quality machines with a warranty period of 1 year. We will provide you with spare parts for free within 2 years, and provide lifetime technical support.